Miller Boat Line's Ferry M/V South Bass at Great Lakes Shipyard
Miller Boat Line’s ferry, M/V SOUTH BASS, is receiving its routine five-year drydocking and USCG inspection at Great Lakes Shipyard. The vessel was hauled out using the Marine Travelift, and the work on the vessel will be completed in two to three weeks.
This marks the first time Great Lakes Shipyard has performed work on the M/V SOUTH BASS. Since 2010, repairs have been performed on all of the other ferries in the Miller Boat Line fleet, including routine five-year drydockings and inspections of the M/V ISLANDER and M/V WILLIAM MARKET as well as the 2010 fabrication and installation of a 40-foot mid-body extension, main engine repower, and steering system upgrades on the M/V PUT-IN-BAY.
The products and services herein described in this press release are not endorsed by The Maritime Executive.